Data Centres
Abstruct Consulting provided RIBA Stage 3 design for the fit out of an existing fallow second floor level data hall space, incorporating a new steel frame structure to support the ceiling floor servicing requirements, loading assessments of the existing structures, and new steel framed external gantry. Detailed coordination between M&E and the new structure was required due to the confined space, within the existing building
| Client | Confidential |
| MEP | i3 Solutions/ Ramboll |
| Architect | TPA |
Abstruct Consulting