Data Centres
A complex Data Centre fitout project, housing 25MW IT in a developer built Data Centre building. Abstruct have been involved from early RIBA Stage 2 through to stage 5 providing Structural and Civil engineering design, including close liaison with the developer’s team to ensure their design could be adapted to meet our Client’s requirements.
| Client | Confidential |
| MEP | i3 Solutions/ Ramboll |
| Architect | TPA |
Abstruct Consulting