Maidstone Grammar School for Girls
Maidstone Grammar School for Girls
Maidstone Grammar School for Girls
Maidstone Grammar School for Girls
Maidstone Grammar School for Girls
Maidstone Grammar School for Girls
Maidstone Grammar School for Girls
Maidstone Grammar School for Girls
MGGS
MGGS
MGGS
MGGS
MGGS
MGGS
MGGS
MGGS

Maidstone Grammar School for Girls

Schools & Community Buildings

ABSTRUCT provided full civil engineering design services for this project which included extensive discussions with Southern Water to develop technical solutions for the site. ABSTRUCT also provided structural design services for the new building’s substructure.

The new 3-storey teaching block comprised a specialist timber frame superstructure supported on a suspended piled concrete raft slab with integrated beams. ABSTRUCT coordinated the foundation design to suit extensive level changes within the footprint of the building. The ground floor slab and foundation design was developed to span across an existing World War II air-raid shelter tunnel system.

Architect Miller Bourne Architects
Contractor Baxall Construction
Superstructure Designer STREIF
Our Role Civil & Structural Engineering